Compliance hub

The environmental obligations that apply to regulated facilities in the Kingdom, in one searchable place. Filter by category, authority or severity, and open any entry for the limits and requirements attached to it.

38Regulations listed
8Categories
3Issuing authorities
24High severity

GAMEP Article 12Air qualityGAMEP2021High

Ambient Air Quality Standards for Industrial Zones

معايير جودة الهواء المحيط للمناطق الصناعية

Industrial facilities must not exceed established ambient air quality limits for PM2.5, PM10, NO₂, SO₂, CO, and O₃. Continuous monitoring required at all major emission points.

Ongoing: annual reporting by 31 March

SAR 100,000–1,000,000 per violation

GAMEP Article 18Air qualityGAMEP2022High

Stack Emission Limits for Power Generation Facilities

حدود انبعاثات المداخن لمنشآت توليد الكهرباء

Power plants and cogeneration facilities must install certified stack emission monitoring systems and comply with NOₓ, SO₂, and particulate limits defined by GAMEP.

Compliance by Q1 2025

Facility shutdown order possible

Royal Decree M/165Air qualityGAMEP2020Medium

Vehicle Emission Standards and Inspection Requirements

معايير انبعاثات المركبات ومتطلبات الفحص

All vehicles operating in Saudi Arabia must comply with Euro 5 emission standards. Commercial fleet operators must maintain emission inspection records.

Ongoing: biennial vehicle inspection

SAR 500–5,000 per vehicle

GAMEP Article 34WaterGAMEP2021High

Industrial Wastewater Discharge Standards

معايير تصريف مياه الصرف الصناعي

Industrial facilities discharging wastewater into municipal networks or water bodies must comply with maximum permissible limits for BOD, COD, TSS, heavy metals, and pH.

Ongoing: quarterly lab testing required

SAR 200,000 + facility suspension

GAMEP Article 41WaterMEWA2022Medium

Treated Sewage Effluent Reuse Standards

معايير إعادة استخدام مياه الصرف الصحي المعالجة

Treated wastewater reused for irrigation, construction, or industrial cooling must meet tertiary treatment standards including microbial limits and nutrient thresholds.

New projects: compliance before commissioning

SAR 50,000–300,000

Royal Decree M/34WaterMEWA2019High

Groundwater Protection and Extraction Permits

حماية المياه الجوفية وتصاريح الاستخراج

Any groundwater extraction exceeding 50 m³/day requires a permit from MEWA. Environmental impact assessment of aquifer depletion is mandatory for industrial operations.

Permit renewal every 3 years

SAR 500,000 + extraction suspension

GAMEP Article 52WaterGAMEP2023High

Desalination Plant Environmental Impact Requirements

متطلبات الأثر البيئي لمحطات التحلية

Desalination plants must submit brine disposal plans, thermal discharge assessments, and chemical additive registers to GAMEP before commissioning.

Pre-commissioning + Annual update

Commissioning permit withheld

GAMEP Article 60Waste managementGAMEP2021High

Hazardous Waste Classification and Storage

تصنيف النفايات الخطرة وتخزينها

All hazardous waste generators must classify waste per GAMEP Schedule H, maintain manifests, and store in GAMEP-approved facilities not exceeding 90-day limits.

Ongoing: 90-day max on-site storage

SAR 500,000 + criminal prosecution

Royal Decree M/201Waste managementGAMEP2024Medium

Construction and Demolition Waste Recycling Requirements

متطلبات إعادة تدوير نفايات البناء والهدم

Construction projects exceeding 5,000 m² must implement a Waste Management Plan achieving minimum 70% diversion of C&D waste from landfill.

Applicable from 01 January 2024

SAR 100,000 per violation

GAMEP Article 67Waste managementGAMEP2020High

Medical and Clinical Waste Disposal Standards

معايير التخلص من النفايات الطبية والسريرية

Healthcare facilities must segregate, treat, and dispose of clinical waste using licensed contractors. Incineration must meet temperature and emission standards.

Ongoing: monthly audit log required

SAR 300,000 + licence revocation

GAMEP Article 78NoiseGAMEP2021Medium

Industrial Noise Emission Limits

حدود انبعاث الضوضاء الصناعية

Industrial facilities must not exceed 70 dB(A) LAeq at the nearest receptor. Noise impact assessments required for new developments within 500m of residential zones.

Ongoing: quarterly monitoring

SAR 20,000–200,000

GAMEP Article 82NoiseGAMEP2021Medium

Noise Impact Assessment for New Developments

تقييم أثر الضوضاء للمشاريع الجديدة

A baseline noise survey and predictive impact model is required for industrial, infrastructure, and mixed-use developments exceeding 2 hectares or within 1km of sensitive receptors.

Required before planning approval

Planning permit refused

GAMEP Article 85NoiseGAMEP2020Low

Construction Site Noise Control Requirements

متطلبات التحكم في ضوضاء مواقع البناء

Construction activities generating noise above 75 dB(A) at 10m must restrict operations to permitted hours. Night work requires prior GAMEP permit.

Permit required for night work

SAR 5,000–50,000

Royal Decree M/34 + GAMEP EIA RegsEIA / ESIAGAMEP2021High

Environmental Impact Assessment: Mandatory Threshold Projects

تقييم الأثر البيئي: المشاريع الخاضعة للاشتراط الإلزامي

All projects classified under GAMEP Category A or B require a full EIA before permits. Category A includes power plants, desalination, refineries, airports, and developments > 100 ha.

Before any construction permit

Construction permit null and void

GAMEP EIA Guidelines 2023EIA / ESIAGAMEP2023High

Environmental and Social Impact Assessment for Giga-Projects

تقييم الأثر البيئي والاجتماعي للمشاريع العملاقة

NEOM, Red Sea Project, Qiddiya, and Diriyah Gate must conduct full ESIA aligned with IFC Performance Standards and Saudi GAMEP requirements, including biodiversity impact assessment.

Ongoing throughout project lifecycle

Project suspension + SAR 5,000,000

GAMEP Article 29EIA / ESIAGAMEP2021High

Environmental Management Plan Implementation Requirements

متطلبات تنفيذ خطة الإدارة البيئية

All projects with approved EIA must implement an Environmental Management Plan (EMP) with monthly monitoring, quarterly audits, and annual third-party verification.

Throughout construction & operation phases

SAR 300,000 per non-compliance event

GAMEP Article 95IndustrialGAMEP2020High

Chemical Inventory and Safety Data Sheet Requirements

متطلبات جرد المواد الكيميائية وبطاقات بيانات السلامة

All industrial facilities handling hazardous chemicals must maintain a complete chemical inventory with updated GHS-compliant Safety Data Sheets accessible to all employees.

Ongoing: SDS updated within 3 years

SAR 200,000 per facility

Royal Decree M/42IndustrialGAMEP2021High

Environmental Permit for Industrial Facility Operation

التصريح البيئي لتشغيل المنشأة الصناعية

No industrial facility may commence operations without a valid Environmental Operation Permit from GAMEP. Permits are sector-specific with binding environmental conditions.

Before any industrial operations begin

SAR 1,000,000 + criminal prosecution

GAMEP Article 101IndustrialGAMEP2022High

Spill Prevention and Emergency Response Plan

خطة منع الانسكابات والاستجابة للطوارئ

Industrial facilities handling > 1,000 litres of liquid hazardous materials must maintain a certified SPCC plan updated every 2 years with annual drills.

Plan required before permit issuance

SAR 500,000 + criminal liability

GAMEP Article 112Marine & coastalGAMEP2021High

Coastal Development Setback and Buffer Zone Requirements

متطلبات حظر البناء الساحلي ومناطق الحماية

No permanent structures may be built within 200m of the mean high-water mark along Red Sea and Arabian Gulf coastlines without GAMEP coastal zone permit.

Permit required before any coastal works

SAR 2,000,000 + demolition order

MARPOL / Royal DecreeMarine & coastalGAMEP2020High

Ship and Port Discharge Regulations

لوائح التصريف من السفن والموانئ

All vessels in Saudi territorial waters must comply with MARPOL. Ports must provide waste reception facilities. Bilge water and ballast water discharge strictly regulated.

Ongoing: MARPOL Annex compliance

SAR 1,000,000 + vessel detention

GAMEP Article 118Marine & coastalGAMEP2023High

Coral Reef and Seagrass Protection in Development Zones

حماية الشعاب المرجانية والأعشاب البحرية

Any development or dredging near coral reef or seagrass habitats requires a Marine Biological Survey, compensation plan, and ongoing ecological monitoring.

Pre-works biological survey required

SAR 5,000,000 + project suspension

Saudi Green Initiative FrameworkClimate & Vision 2030GAMEP2023High

Carbon Emission Reporting: Large Industrial Emitters

متطلبات الإبلاغ عن انبعاثات الكربون

Industrial facilities emitting > 25,000 tCO₂e annually must register with GAMEP National Carbon Registry, submit verified GHG inventory, and report Scope 1 and 2 emissions using ISO 14064.

Annual report by 30 June each year

SAR 500,000 per year unreported

Vision 2030 Circular Carbon EconomyClimate & Vision 2030MEWA2024Medium

Renewable Energy Integration for Industrial Parks

متطلبات دمج الطاقة المتجددة للمناطق الصناعية

New industrial parks and special economic zones must demonstrate a minimum 30% renewable energy share in their master energy plan as part of Vision 2030 green economy.

All new parks from 2024 onwards

Development license conditions

GAMEP Circular 2024/08Climate & Vision 2030GAMEP2024High

Environmental Requirements for NEOM and Giga-Project Developers

المتطلبات البيئية لمطوري مشروع نيوم والمشاريع العملاقة

NEOM and all Vision 2030 giga-project developers must achieve net-zero carbon operations by 2030, implement circular economy principles, and publish annual sustainability reports.

Net-zero target by 2030

Project license conditions

GAMEP Article 22Air qualityGAMEP2022High

Volatile Organic Compound (VOC) Emission Controls

ضوابط انبعاثات المركبات العضوية المتطايرة

Petrochemical, paint, and solvent-using facilities must install VOC capture systems and comply with total VOC emission thresholds. Leak Detection and Repair (LDAR) programmes are mandatory.

LDAR programme: quarterly inspection

SAR 150,000 per event

GAMEP Article 27Air qualityGAMEP2023Medium

Dust and Particulate Matter Control for Construction Sites

التحكم في الغبار والجسيمات الدقيقة في مواقع البناء

All construction sites > 1,000 m² must implement a Dust Management Plan including water spraying, hoarding, and real-time PM10 monitoring at site boundaries.

Plan required before site clearance

SAR 30,000 per violation

MEWA Regulation 2022/14WaterMEWA2022Medium

Water Conservation Requirements for Commercial Buildings

متطلبات ترشيد المياه للمباني التجارية

Commercial buildings > 10,000 m² must install smart metering, greywater recycling systems, and achieve minimum 30% water use reduction versus 2020 baseline.

New buildings: comply at commissioning

SAR 50,000 per audit cycle

GAMEP Article 72Waste managementGAMEP2022Medium

E-Waste and Electrical Equipment Disposal Requirements

متطلبات التخلص من النفايات الإلكترونية والمعدات الكهربائية

Businesses disposing of electronic equipment, batteries, and fluorescent lamps must use GAMEP-registered e-waste recyclers. Take-back schemes mandatory for manufacturers.

Ongoing: annual e-waste audit

SAR 75,000 per disposal event

GAMEP Article 108IndustrialGAMEP2023High

Environmental Auditing Requirements for Industrial Facilities

متطلبات المراجعة البيئية للمنشآت الصناعية

Category A industrial facilities must conduct annual third-party environmental compliance audits with certified auditors. Results submitted to GAMEP within 60 days of completion.

Annual: submit within 60 days

SAR 200,000 per missed audit

NCEC Marine Regulation 2023Marine & coastalNCEC2023High

Marine Protected Area Buffer Zone Management

إدارة منطقة الحماية البحرية

Activities within 1km of Marine Protected Areas (MPAs) require GAMEP environmental clearance. Anchoring, dredging, and underwater works are prohibited within MPA boundaries.

Clearance before any marine activity

SAR 3,000,000 + activity suspension

Saudi Green Initiative 2023Climate & Vision 2030MEWA2023High

Biodiversity Conservation and Natural Habitat Protection

حفظ التنوع البيولوجي وحماية الموائل الطبيعية

The Saudi Green Initiative mandates no-net-loss of biodiversity for all major developments. Biodiversity Management Plans with offset schemes required for projects in sensitive habitats.

BMP before construction approval

SAR 2,000,000 + project suspension

GAMEP Article 33EIA / ESIAGAMEP2022High

Cumulative Impact Assessment for Industrial Cluster Developments

تقييم التأثير التراكمي لتطوير التجمعات الصناعية

Industrial clusters and economic zones with multiple co-located facilities must commission a Cumulative Environmental Impact Assessment (CEIA) covering shared infrastructure impacts.

Before cluster master plan approval

Development license withheld

GAMEP Article 75Waste managementGAMEP2023High

Landfill Design and Leachate Management Standards

معايير تصميم مدافن النفايات وإدارة الراشح

Engineered landfills must include compacted clay and HDPE liner systems, leachate collection, and landfill gas capture. Environmental monitoring wells required at all permitted landfills.

Design compliance before licensing

Operating license revoked

GAMEP Article 115IndustrialGAMEP2021Medium

Environmental Training and Competency Requirements

متطلبات التدريب البيئي والكفاءة

All industrial facilities must have at least one certified Environmental Health & Safety (EHS) officer per site. Annual environmental awareness training is mandatory for all operational staff.

EHS Officer certified before operations

SAR 50,000 per non-compliant facility

GAMEP Article 25Air qualityGAMEP2023Medium

Odour Management Requirements for Industrial Facilities

متطلبات إدارة الروائح للمنشآت الصناعية

Industrial facilities generating detectable odours must quantify emissions in odour units using EN 13725, prepare an Odour Management Plan, and investigate complaints within 48 hours.

OMP required before permit renewal

SAR 30,000 per complaint upheld

GAMEP Article 37EIA / ESIAGAMEP2022Medium

Heritage and Archaeological Impact Assessment Requirements

متطلبات تقييم الأثر على التراث والآثار

Developments in proximity to heritage sites or areas of archaeological potential must commission a Heritage Impact Assessment (HIA) before ground disturbance permits are issued.

HIA before any ground disturbance

SAR 1,000,000 + works stopped

Vision 2030 / NCCCClimate & Vision 2030NCEC2024Medium

Corporate Sustainability Reporting Requirements

متطلبات تقارير الاستدامة للشركات

Listed companies and large enterprises with turnover > SAR 500M must publish annual ESG/Sustainability reports aligned with GRI Standards and Saudi Exchange Sustainability Reporting Guide.

Annual: within 4 months of fiscal year end

Stock exchange disclosure penalty

Chat with us on WhatsApp
Ask an ExpertFree Consultation →
Environmental Specialist
Accredited environmental consultant · Riyadh
Riyadh · Sun–Thu
Have a question?
Send us your question and we will come back to you during business hours.
or send a quick message