Marine environmental services
From coastal baseline assessment to biodiversity monitoring, we produce the survey data and reporting that marine and coastal projects are required to submit.
What the regulator asks for
How we run it
Scope agreed in writing, field survey to referenced methods, laboratory analysis, then reporting in the format the reviewer expects. Each stage names the standard applied.
Free consultationSurvey scope agreed before the design is fixed costs less than redesign after it.
Free consultationWho this is for
Ports and terminals
Dredging, berth works and operational discharge each carry their own survey requirement.
Desalination intakes and outfalls
Intake entrainment and discharge plume behaviour usually need both survey and modelling.
Coastal development
Habitat present at the shoreline determines what can be built and what has to be avoided.
Common questions
How long does a marine baseline take?
Do you cover both water and sediment?
Can you work from an existing dataset?
Explore our other environmental services
Free consultation
Tell us the site and what is planned, and we will scope the work.




